Every Job is different but we can give you some indicative idea of costs.
For a firm written price your welcome to get in
contact with use and arrange a free onsite visit.
The kick in the pants is that western power are going to charge between $625 and $655 to temporary disconnect your power and then reconnect once the new pole is in place.
For a single dwelling
6-8 hours total for 2 guys over 2 days
There is a Truck and Hiab operator
A pile of concrete
Possibly a new connection point and bull nose on your property's eves
A pile of paperwork, notices, phone calls to western power
Your power maybe off for 24 hours, often we can get in before western power disconnects you and have the new pole in position, if this is not possible the chance of getting you disconnected, installing a new pole in waiting for the concrete to set all by generally by the 1100-1130 am cut off time for a reconnection on the same day if almost impossible
An Indicative price on average including the Western power fee for a single dwelling with no meter panel your looking at around $3750-$4250.
If you have a site board (meter) attached at the pole this can increase the cost.
If you share the pole with an adjoining property, the cost is shared.
If you have a strata development with multiple units with individual meters at each unit the cost will be higher.